Go to Fortress Home Page Search the Fortress Website Print this Page
Case StudiesCase Studies. Explore the many uses and applications of carbon fiber technology
Videos & ArticlesVideos & Articles. Read and watch videos and articles on Fortress and carbon fiber uses.
NewsNews. Read about the latest news from Fortress Stabilization.
Frequently Asked QuestionsFrequently Asked Questions. Commonly asked questions.
Calendar of EventsCalendar of Events. What's happening now and in the future at Fortress.
TestimonialsTestimonials. Read what others have to say about Fortress and Carbon Fiber applications.
Locate InstallersLocate Certified Installers. Find a certified Fortress installer.
Link to UsLink to Us. Provide a link to Fortress Stabilization on your Website.
NewslettersThe Fortress Newsletter. Read current and past issues of our Newsletter.
Concrete RepairConcrete Repair Carbon-fiber technologies in concrete repair
Foundation RepairFoundation Repair Carbon-fiber technologies in foundation repair applications
Concrete ReinforcementConcrete Reinforcement Carbon-fiber technologies and reinforcement of concrete
Bowed basement wallsBowed Basement Wall Carbon-fiber technologies application in the reinforcement of bowed basement walls

Case Studies
Print this page
Date: June 2009
Location: Cleveland OH
Contractor: Expert Basement Repair
Material Used: Kevlar Necktie top wall Anchor System

Project Scope:
Top of poured concrete wall was sliding inward due to lack of proper seal plate connection. Previous methods were very intrusive. Typically steel I beams or steel angle iron would have been used. The Neckties can be easily hidden by insulation in between the joists at the ridge board.

Non-weight bearing wall...thus the joists running parallel with the wall. Several obstacles to work around. Drill holes and a long extension were used to install neckties to ridge board.


Conclusion:
Six Kevlar Neckties can be installed in less than 1 hour with no obstructions this unit with tight area did take 1 day. The Neckties have a pullout from the ridge board of 6,000 psi and the load is distributed in between joists.