Go to Fortress Home Page Search the Fortress Website Print this Page
Case StudiesCase Studies. Explore the many uses and applications of carbon fiber technology
Videos & ArticlesVideos & Articles. Read and watch videos and articles on Fortress and carbon fiber uses.
NewsNews. Read about the latest news from Fortress Stabilization.
Frequently Asked QuestionsFrequently Asked Questions. Commonly asked questions.
Calendar of EventsCalendar of Events. What's happening now and in the future at Fortress.
TestimonialsTestimonials. Read what others have to say about Fortress and Carbon Fiber applications.
Locate InstallersLocate Certified Installers. Find a certified Fortress installer.
Link to UsLink to Us. Provide a link to Fortress Stabilization on your Website.
NewslettersThe Fortress Newsletter. Read current and past issues of our Newsletter.
Concrete RepairConcrete Repair Carbon-fiber technologies in concrete repair
Foundation RepairFoundation Repair Carbon-fiber technologies in foundation repair applications
Concrete ReinforcementConcrete Reinforcement Carbon-fiber technologies and reinforcement of concrete
Bowed basement wallsBowed Basement Wall Carbon-fiber technologies application in the reinforcement of bowed basement walls

Case Studies
Print this page
Date: September 21, 2007
Structure: Grande Shores Ocean Resort, Myrtle Beach, South Carolina
This is a 7-story resort hotel on the Atlantic beachfront. It is constructed using standard concrete skeleton method.
Contractor: Sandcastle Construction, Hilton Head, SC
Engineer: Peter Sherritt P.E., Hilton Head, SC
Material Used: Pre-cured Pre-preg w/peel-ply column wrap vacuum laminated. Designed by layout of job scope. Laminated with #4020 Epoxy.

Project Scope:
Concrete columns façade were pulling away from the balconies. Challenge was to strap and reinforce columns, yet make reinforcement aesthetically pleasing.



Solution:
Pre-preg column wraps allowed for fast installation, completing project with minimal disruption and prior to hotels busy season. With this method they were still able to function with only a small area of rooms closed off to public.

Original design was to install 200 lb steel plates that would have added significant weight, would not have been aesthetically pleasing and would have closed a large area of the hotel losing them revenue.