Go to Fortress Home Page Search the Fortress Website Print this Page
Case StudiesCase Studies. Explore the many uses and applications of carbon fiber technology
Videos & ArticlesVideos & Articles. Read and watch videos and articles on Fortress and carbon fiber uses.
NewsNews. Read about the latest news from Fortress Stabilization.
Frequently Asked QuestionsFrequently Asked Questions. Commonly asked questions.
Calendar of EventsCalendar of Events. What's happening now and in the future at Fortress.
TestimonialsTestimonials. Read what others have to say about Fortress and Carbon Fiber applications.
Locate InstallersLocate Certified Installers. Find a certified Fortress installer.
Link to UsLink to Us. Provide a link to Fortress Stabilization on your Website.
NewslettersThe Fortress Newsletter. Read current and past issues of our Newsletter.
Concrete RepairConcrete Repair Carbon-fiber technologies in concrete repair
Foundation RepairFoundation Repair Carbon-fiber technologies in foundation repair applications
Concrete ReinforcementConcrete Reinforcement Carbon-fiber technologies and reinforcement of concrete
Bowed basement wallsBowed Basement Wall Carbon-fiber technologies application in the reinforcement of bowed basement walls

Case Studies
Print this page
Date:April 2010
Structure: Residential home, Lansing MI
Contractor: Ayers Basement Systems
Engineer: Hayman Residential Engineering and City of Lansing
Material Used: Fortress Pre-Cured Pre-Preg Grid Mesh

Project Scope:
Scope of project is to cost effectively install a new reinforced foundation in front of the existing old foundation which is crumbling due to deterioration of mortar and block themselves.

Before Before
Before
Solution:
Design was based on shotcrete pool design, combined with a cantilever load of building. In short design used current foundation as backfill for new foundation. The floor was removed for interior system. Spread footer was increased to accept new wall. 4'X 8' sections of Fortress Carbon Grid were hung off of new seal plate. Drainage board was installed against old foundation. (becoming sandwiched between old and new foundation). Then a 6" shotcrete wall was shot creating a brand new basement interior. Total job completed in 5 days.

During During
During
After After
After


Fortress Stabilization Systems
1-800-207-6204



spacer
spacer
Total Unique Visitors: 197263
Since September 7, 2006
Unique Visitors today: 1864
Sun, 5 September 2010