Go to Fortress Home Page Search the Fortress Website Print this Page
Case StudiesCase Studies. Explore the many uses and applications of carbon fiber technology
Videos & ArticlesVideos & Articles. Read and watch videos and articles on Fortress and carbon fiber uses.
NewsNews. Read about the latest news from Fortress Stabilization.
Frequently Asked QuestionsFrequently Asked Questions. Commonly asked questions.
Calendar of EventsCalendar of Events. What's happening now and in the future at Fortress.
TestimonialsTestimonials. Read what others have to say about Fortress and Carbon Fiber applications.
Locate InstallersLocate Certified Installers. Find a certified Fortress installer.
Link to UsLink to Us. Provide a link to Fortress Stabilization on your Website.
NewslettersThe Fortress Newsletter. Read current and past issues of our Newsletter.
Concrete RepairConcrete Repair Carbon-fiber technologies in concrete repair
Foundation RepairFoundation Repair Carbon-fiber technologies in foundation repair applications
Concrete ReinforcementConcrete Reinforcement Carbon-fiber technologies and reinforcement of concrete
Bowed basement wallsBowed Basement Wall Carbon-fiber technologies application in the reinforcement of bowed basement walls

Case Studies
Print this page
Date: March 20, 2003
Structure: New Construction
Contractor: Concrete & Waterproofing Solutions
Engineer: Stephen R. Temullo, PE / Greg S. Blaszick, PE
Material Used: Fortress 4 layers 300 g.s.m. carbon fiber unidirectional tow sheet with Fortress #1276 Epoxy system.

Project Scope:
Reinforcement of new construction commercial building foundation. Structural steel was deemed inadequate for compression and tension loads.



Solution:
Fortress Carbon Fiber was designed to bring bearing capacity to acceptable levels.



Observations:
Origionally, steel was considered; however, problems with connections, loss of square footage, nd appearance made carbon fiber a viable option. Tow sheet was designed because of the amount of carbon needed for the expected load. Fortress solved this problem conomically and the job was completed in 4 working days.